Remedial Investigation and Endangerment Assessment/
Feasibility Study (RI/EA/FS) 

 

Documents Related to the On-Post Operable Unit

Integrated Endangerment Assessment/Risk Characterization

Volume I - Part 1 | Part 2 | Part 3
Volume II - Part 1 | Part 2
Volume III - Part 1 | Part 2 | Part 3 | Part 4 | Part 5
Volume IV 

Remedial Investigation Summary Report 

  • This document presents a summary of the program and findings of the U.S. Army's Remedial Investigation conducted at the RMA. The investigation, which was coordinated with a corresponding off-post remedial investigation, included the entire on-post facility.

Part 1 | Part 2 | Part 3

Detailed Analysis of Alternatives Report

  • This document includes a description, assessment and comparative analysis of the cleanup approaches considered to meet the RMA remediation objectives.

Volume I
Volume II
Volume III
Volume IV
Volume V
Volume VI
Volume VII

Documents Related to the Off-Post Operable Unit (OU)

Off-Post OU Remedial Investigation & Chemical Specific Applicable or Relevant & Appropriate Requirements Final Report
Off-Post Operable Unit (OU) Remedial Investigation Final Addendum
Off-Post OU Endangerment Assessment/Feasibility Study Final Report