Updated 150745DEC 19

Heavy Snow Warning: Potential for heavy snow accumulation greater than or equal to 4 inches within 12 hours until 5 P.M. 15 DEC.

Fort Riley is currently at Force Protection BRAVO

Roads South of Vinton School Road are RED

Roads North of Vinton School Road are RED

Williston Point Road is CLOSED.  Caisson Hill Road is CLOSED.

All Religious Services on Fort Riley are canceled.

 

 

 

 

Fort Riley's weather update (Automated Communicator Board) phone numbers are (785) 239-3700 or 1-866-562-7319.


 Menu options provide Weather Advisories, Road Conditions / Closures, and Early Releases or Late Arrivals.
 Weather-related information is also available,

here or Fort Riley Facebook.

HEAT CATEGORIES

The heat category chart is a visual aid to assist leaders in determining the correct work/rest ratio for their Soldiers in hot weather conditions.

Moreover, leaders are reminded to monitor their Soldiers for adequate water consumption whenever their soldiers are performing to hard work.


ROAD CONDITIONS

TRAFFIC REPORT - ONGOING CLOSURES AND DELAYS

In accordance with U.S. Northern Command directive, Fort Riley has increased security measures across the installation. There is no specific threat to Fort Riley. This is a prudent measure to establish proactive actions to mitigate threats to the installation and protect personnel, assets, resources and infrastructure. We always take the security of our Soldiers, Families and civilians seriously. Remain vigilant and report any suspicious activity to (785)240-WARN (240-9276).

Access Control Information

Visit the Visitor and Access Information Page

Access Gate Changes

Closures and Delays

The following scheduled road closures and expected traffic delays are due to ongoing infrastructure upgrades. Please allow more time in your travels or avoid these areas during these periods.

Beginning January 29 and expected to last about 6 weeks - Southbound traffic on Huebner Rd will be redirected to Northbound Huebner Rd. The intersection at Custer & McCormick will be a temporary 4-way stop during this time. This work is part of phase two for the bridge replacement on Huebner Rd.

Dec. 23, 2016 - Apr. 01, 2018: road construction will be near the intersection of Huebner and McCormick Roads, west of the Post Cemetery. Drivers should be alert for movement of trucks on and off the roadway. The U.S. Army Corps of Engineers will be overseeing construction of a replacement bridge and realignment of Huebner Road.

WEATHER EFFECTS MATRIX

The Weather Effects Matrix consists of the Daily Operations for Snowburst levels I-IV, the Road Conditions levels (Green/Amber/AmberClosed) and their effect on Military Vehicle movements, Temperature Restrictions on Training and terminology for Daily Operations.

Call (785) 239-3700 for Road Conditions, Delays, Early Release and Weather Advisories / Warnings.

WORK FORCE MANNING LEVELS

CORVIAS COMMUNITY CENTERS - CONTACT INFORMATION

Colyer Forsyth: (785) 71702260

Ellis Heights: (785) 717-2252
Historic Main Post: (785) 7172240
McClellan Place: (785) 717-2243
Warner Peterson: (785) 717-2246

USAG Fort Riley Facebook

Fort Riley Mass Warning and Notification System

20191115 ALERT ad.jpg