Updated  11:00 a.m., 09 MAY 21

Roads South of Vinton School Road are GREEN.

Roads North of Vinton School Road are GREEN.

Kitty Underpass is CLOSED.

Williston Point Road is OPEN.

Caisson Hill Road is OPEN.

Ernie Pyle Road is OPEN.

 

Fort Riley's weather update (Automated Communicator Board) phone numbers are (785) 239-3700 or 1-866-562-7319.


 Menu options provide Weather Advisories, Road Conditions / Closures, and Early Releases or Late Arrivals.
 Weather-related information is also available,

here or Fort Riley Facebook.

HEAT CATEGORIES

The heat category chart is a visual aid to assist leaders in determining the correct work/rest ratio for their Soldiers in hot weather conditions.

Moreover, leaders are reminded to monitor their Soldiers for adequate water consumption whenever their soldiers are performing to hard work.


ROAD CONDITIONS

TRAFFIC REPORT - ONGOING CLOSURES AND DELAYS

In accordance with U.S. Northern Command directive, Fort Riley has increased security measures across the installation. There is no specific threat to Fort Riley. This is a prudent measure to establish proactive actions to mitigate threats to the installation and protect personnel, assets, resources and infrastructure. We always take the security of our Soldiers, Families and civilians seriously. Remain vigilant and report any suspicious activity to (785)240-WARN (240-9276).

Access Control Information

Visit the Visitor and Access Information Page

Access Gate Changes

Closures and Delays

The following scheduled road closures and expected traffic delays are due to ongoing infrastructure upgrades. Please allow more time in your travels or avoid these areas during these periods.

Beginning January 29 and expected to last about 6 weeks - Southbound traffic on Huebner Rd will be redirected to Northbound Huebner Rd. The intersection at Custer & McCormick will be a temporary 4-way stop during this time. This work is part of phase two for the bridge replacement on Huebner Rd.

Dec. 23, 2016 - Apr. 01, 2018: road construction will be near the intersection of Huebner and McCormick Roads, west of the Post Cemetery. Drivers should be alert for movement of trucks on and off the roadway. The U.S. Army Corps of Engineers will be overseeing construction of a replacement bridge and realignment of Huebner Road.

WEATHER EFFECTS MATRIX

The Weather Effects Matrix consists of the Daily Operations for Snowburst levels I-IV, the Road Conditions levels (Green/Amber/AmberClosed) and their effect on Military Vehicle movements, Temperature Restrictions on Training and terminology for Daily Operations.

Call (785) 239-3700 for Road Conditions, Delays, Early Release and Weather Advisories / Warnings.

WORK FORCE MANNING LEVELS

CORVIAS COMMUNITY CENTERS - CONTACT INFORMATION

Colyer Forsyth: (785) 71702260

Ellis Heights: (785) 717-2252
Historic Main Post: (785) 7172240
McClellan Place: (785) 717-2243
Warner Peterson: (785) 717-2246

ROAD CONSTRUCTION

under_construction_PNG68.png

Bamford Street Closure from April 12 - 16

Bramford will completely closed for replacement of asphalt. View the map below to see the detour routes. 

Bamford_St_Closure_4-12_to_16 -21.jpg

 

Building 4010 and 4012 Parking Lot Entrance Constriction April 2 - 16

Only one lane of traffic will be open at each entrance. 

4010_4012_Parking_Lot_Entrance_4-2-21_4-16-21.jpg

 

Building 5202, B6620 and B6422 Parking Lot Entrances single lane restrictions
April 2 - 23

One lane of traffic will be restricted at the parking lot entrance off Normandy Drive to install water pipes. One lane of traffic will be open at all times to install water pipes

5202_Parking_Lot_Entrance_Partial_Closure_4.2.21_through_4.23.21.jpg

6620_Parking_Lot_Entrance_Partial_Closure_4.2.21_through_4.23.21.jpg

6422_Parking_Lot_Entrance_Partial_Closure_4.2.21_through_4.23.21.jpg

 

Sustainment Drive Construction: March 31 - May 3

Road repairs will be conducted and the intersection of Sustainment/Jackson and it will be closed during the construction. See map for the detour during construction. 

20203_Sustainment_Thomas_Closure.jpg

 

Henry Drive Construction: March 26, 2021 - April 16, 2022

Starting March 26, Henry Drive will be closed to all traffic from the Ray Road roundabout to the Smoky Hill intersection for complete road replacement, construction of a new round-about and other improvements. The estimated time until the road is open for 2-way, 2-lane traffic is the end of November 2021. Henry ACP will remain open during the entire project, but there could be intermittent lane closures at the ACP. During the road closures traffic will be rerouted around the airfield via Smokey Hill Road, Marshall Drive, Runway Road and Ray Road.

HenryRoadClosure22Mar21.jpg

 

12th Street Road Closure/Camp Funston - Oct 27 - May 29, 2021

Road will be closed to all traffic between Buffalo Soldier Rd. and B. St. in Camp Funston for storm sewer construction. Use Buffalo Soldier Dr., Huebner Rd. and A Street for alternate routes. 

 

River Road lane closure: Oct. 5, 2020 - Apr 21, 2021

There will be isolated lane closures on River Road (Camp Forsyth south of PX) east bound for ditch/storm drain repairs.