Gate Maintenance
Gate 6
- Gate 6 (Visitor Center/traffic circle gate)
- On weekdays, from 5 a.m. to 9 p.m.: Gate 6 is dedicated to construction and commercial traffic only. Use alternate gates during this time. For non-commercial visitor sign-in, please use Gate 3 (McDonalds gate).
- On weekdays, 9 p.m. to 5 a.m.: Gate 6 is open to all regular traffic, including privately owned vehicles.
- On weekends, Gate 6 is open to all traffic
Additional Announcements
Netzaberg Internet Service Changes
As of now, we kindly ask you to visit the following pages for detailed information:
For additional information, feel free to visit the
TKS Shop - Off Post
Location: Grafenwoehr City
Address: Alte Amberger Str. 40, 92655 Grafenwoehr, Germany
TKS Shop - On Post (PX)
Location: Tower Barracks PX
Address: Building 700, Grafenwoehr, Germany
TKS Customer Service Phone Number: +49 631 3522 499
News Releases
Customs News Release: Visitors or Guests Driving in Germany
Housing Meter Reading
Attention Off Post Leased Housing Tenants: Submit your Utility Meter Readings following the METER READING SIMPLIED GUIDANCE (ANNEX A to OPORD 26-005) in this post. Please send a picture of your meter and the meter reading info to the following email address: usarmy.bavaria.id-europe.list.dpw-publicutility@army.mil
This is an annual requirement as a tenant of an off post leased housing residence. Help us help the Army save millions and put funds back into the mission and housing.
Without meter readings, Host Nation utility companies estimate the consumption and charge at a higher usage and rate overall. Accurate reporting will immediately impact and reduce costs in 2026 and those funds will be transferred to the war fighter mission and housing vise the utility company.
Giant Voice Testings
Testing of the Giant Voice system will take place every Friday around noon to ensure the system is functioning properly and to keep our community safe.
You may hear a siren and a message in both English and German. This is only a test; no action is required from community members.
Off-Post Road Closure
Off-Post traffic update: Parkstein - Hütten Bridge Replacement Over B470. Starting Monday, March 30 construction will begin to replace the bridge on Kreisstraße NEW 2 (Parkstein - Hütten) over Bundesstraße 470 (Pressath - AS Weiden-West A93). The project aims to improve the clearance height under the bridge, which has caused frequent collision damage in the past. The project is expected to be completed by November 2026.
Initial Full Closure: From March 30, 7 a.m., both B470 and NEW 2 will be completely closed for three weeks to allow for the demolition of the old bridge.
Detours:
B470 Detour: From Weiden (AS Weiden-West) via A93, B22 to Erbendorf, B299 through Hessenreuth, and back to Pressath. The same route applies in reverse.
Additional Detour from Grafenwöhr: Via Mantel to Weiden.
NEW 2 Detour: Follows the same routes, with access to Parkstein-Hütten remaining open.
After the initial closure, a temporary roundabout will allow traffic flow at the construction site.
Please plan for additional time for your commute during the closures and detours. Find more information here: https://www.stbaas.bayern.de/service/medien/pressemitteilungen/2026/0494/index.html?fbclid=IwdGRjcAQotMBleHRuA2FlbQIxMQBzcnRjBmFwcF9pZAo2NjI4NTY4Mzc5AAEem0u2Ac84Ah3IQ5Y-Hy2r59u3iefan8b4efTY9JfQFmm3pr4HBtZmBw0FWU8_aem_vRRajOTwbUw4WtAOBLmLXw