Post-construction site runoff control Program

The goal of the Post-Construction Site Runoff Control Program is to minimize the adverse effects of development by implementing post-construction requirements that accomplish the following: minimize downstream flooding and erosion, remove pollutants (sediment, nutrients, bacteria, and heavy metals), and encourage infiltration of rainfall to replenish groundwater and maintain stable base flow in streams.  Construction projects that are performed by or under contract for Fort Liberty, including roads and bridges, must meet the requirements the stormwater management and water quality protection required by 15A NCAC 02H Section .1000.