construction site stormwater runoff control Program
The goal of the Construction Site Stormwater Runoff Control Program is to prevent and minimize sediment loss from Installation construction sites. This is done through reviewing proposed erosion and sediment control plans, providing recommendations for specific practices as needed, and conducting inspections of each construction site to verify compliance with the North Carolina Sediment Pollution Control Act of 1973 (SPCA) program as defined in 15A NCAC Chapter 04.